What moved the panel decides the method. New runs and replacement panels are 4 inches thick with fiber mesh, control joints every 5 feet, expansion joints where they meet old concrete or a building, and a broom finish so the surface keeps its grip.
Curb ramps, landings and detectable warnings are formed and set against the accessible stall layout. We check the route as one piece, from the stall and access aisle up the ramp and along the walk to the entrance, because an overlay that lifts the asphalt at the ramp's toe, or a landing that settles, is usually what puts a ramp out of tolerance. With our asphalt crew on the same job, the joint where the walk meets the parking surface is set flush.
The Department of Justice treats resurfacing a parking lot as an alteration under the 2010 ADA Standards, so a repave is the time to look at the accessible route. Our striping page covers the ADA stall rules. For sidewalk work in the public right-of-way, we coordinate the permit and schedule the inspections.