Asphalt Patching at The Crossing Apartments in Denver
Asphalt Coatings Company patched the parking lots at The Crossing Apartments on Albrook Drive in northeast Denver over two days in a row.

- Services: asphalt patching
- Property
- Location
- Written, itemized scope
Request a Free Patching Quote
You receive a written scope with itemized pricing before any work begins.
For commercial properties only, including HOA, multifamily and municipal sites.
Thank you. Your request is in.
An estimator replies within one business day. Need it today? Call the Denver Metro headquarters at (303) 340-4750.
- Google reviews
Asphalt Coatings Company is rated 4.7 out of 5 on Google.
- BBB profile
Asphalt Coatings Company has an A+ BBB rating.
Where the Patches Went
The new asphalt went wherever the old pavement had broken up, from the curbs to the middle of the drive aisles.

Along the Curbs
Patches run tight to the red fire lane curbs, including the stretch beside the trash bins.

Around the Islands
At the rock-filled islands, the new asphalt meets the island curb.

Through the Stall Rows
Larger L-shaped and stepped patches cross whole rows of parking stalls.

In the Drive Aisles
On the second day the crew moved to the aisles and the fenced edge of the lot.

Simple Rectangles
Some patches are simple rectangles laid across the cracked lot.

Stepped around Older Repairs
Others step around older repairs to take in the whole damaged area.
Rolling the New Asphalt
A small double-drum roller worked alongside the crew to compact each fresh patch.
The roller sat beside the patches by the islands and the curbs on the first day. On the second, it rode on the trailer between areas.

More Photos from The Crossing Apartments
These photos show the patches from both days, along the curbs, the fence and the drive aisles.

Among Older Repairs
Fresh asphalt patch among older repairs in a parking lot, first day of patching.

By the Trash Bins
Asphalt patch along a red curb beside the trash bins, first day of patching.

Roller at the Curb
Roller parked behind a new asphalt patch at the red curb, first day of patching.

Along the Fence
New asphalt patch alongside a screened fence at the edge of the lot, second day of patching.

At the Lot Edge
Rectangular asphalt patch near the fenced edge of the parking lot, second day of patching.

Over a Cracked Area
Fresh asphalt patch over a cracked area of the parking lot, second day of patching.
Services on This Project
This project was asphalt repair, which our Denver parking lot maintenance covers.
Parking lot repair
Patching and pothole repair, with the base fixed first where it failed. Parking lot maintenance and repair
More Denver projects
Valley pans at Storage Tech and striping at Arrupe Jesuit High School. All Denver projects
